Blast Furnace Gas Equal Pressure Recovery and Air Discharge

1. Production status and environmental protection requirements


In the blast furnace smelting production process, the pressure-equalizing gas in the furnace top tank is usually discharged directly into the atmosphere after passing through the cyclone dust collector and the muffler. This part of the gas is a toxic and combustible gas mixture containing a large amount of CO and dust. The atmospheric environment, especially the blast furnace production area, causes pollution and wastes energy.


With the increasingly strict environmental protection requirements, most regions and iron and steel enterprises now require the use of a full recovery method, and the blast furnace gas is not released throughout the process;


2. Rationale


Pressure equalization recovery part (full recovery):


Before charging the material tank, the pressure in the material tank is consistent with the pressure in the furnace and is in a high pressure state, while the pressure in the gas recovery device connected to the atmospheric gas pipe network is in a normal pressure state, and the gas recovery between the material tank and the recovery device is opened. The valve uses the natural pressure difference to recover the gas discharged from the tank. After the recovery process is completed, the remaining gas in the tank with pressure close to normal pressure is released according to the blast furnace charging procedure. This process is "partial recovery".


The so-called "full recycling" means that after the natural recycling process ends:


Through the injection and suction device, the high-pressure clean gas is used to drive the remaining pressure gas in the material tank into the recovery device through the injection and suction effect. When the injection and suction recovery is completed, cut off the valve of the gas recovery system and stop the injection and suction, and open the upper sealing valve to load the material.


During the whole process of the process, the venting valve is always in a closed state, no venting occurs, and all the gas that is vented in the intermediate material tank can be fully recovered.


Recycling of large scattered gas on the top of the off-air furnace:


The gas that needs to be released will continue to be dedusted after gravity dedusting and dry dedusting. The clean gas enters the newly added RGR gas recovery complete set of equipment for recovery, and then passes through the buffer device and sends it to the clean gas pipe network.


Rewind gas purification:


A venting pipe is added to the clean gas pipeline of the dry dust removal system, and the waste gas that was discharged through the venting valve on the top of the blast furnace during re-airing in the previous blast furnace is discharged into the atmosphere through gravity dust removal and dry dust removal , reduce dust emissions to the atmosphere.


3. Advantages of Shanghai Xuanding


For the blast furnace gas pressure equalization recovery and wind break release project, Nanjing Xuanding, a wholly-owned subsidiary of Xuanding, as the smelting division, is specialized and responsible for the specific implementation of this type of project;


The professional and technical personnel in Xuanding smelting are all from well-known design institutes such as Jiangsu Metallurgical Design Institute and major universities. They are very familiar with and understand the process flow and equipment of smelting, and can respond to the different actual conditions and needs of customers. to provide the most suitable solution;


Based on the professional team's familiarity and understanding of the blast furnace production process, the design of the pressure equalization recovery system will be specially designed and formulated for the production rhythm of the existing blast furnace, and the recovery process will not have any impact on the blast furnace charging rhythm;


Fully demonstrate and theoretically check the ejection system and the existing blast furnace ejection medium (high-pressure gas or nitrogen, etc.), and combine the successful operation of multiple pressure equalization recovery systems to ensure the ejection effect and achieve full recovery;


4. Technical Features


4.1 The application of internal and external heat tracing technology of patented technology can realize dry ash


1662537858913137.png


1662537860212126.png


4.2 Ejector design and full recovery


The recovery time period and ejection time are reasonably determined according to the blast furnace charging cycle, without affecting the blast furnace charging and production capacity


According to the pressure of the ejected medium and the characteristics of the medium, the ejector is designed in a targeted manner to ensure that the ejection time meets the requirements


1662537919350506.png


1662537921184001.png


5. Production effect


1662537986181544.png


1662537987658680.png


1662537989573807.png


1662537990806930.png


1662537992873858.png



Prime Metallurgy Technology Group

Telephone:+86 21 24259995

Fax::+86 21 24259992

E-mail:xdjt@shprimetech.com (China)

              zhaomeng@shprimetech.com (Overseas)

Address:Room 101, Building 1, No. 396, Xinfu Road, Minhang District, Shanghai


ABOUT US

BUSINESS

CASE

Follow us

Copyright @ 2022 Shanghai Prime Metallurgical Technology Group Co., Ltd.

seo seo